Schedules that can't disagree with the drawings.

Door schedules, finishes, rebar, equipment lists and BOQs extracted directly from the coordinated model — so documentation, quantities and design never drift apart.

Hand-maintained schedules always drift

On a traditional project, the drawings say one thing, the door schedule another, and the BOQ a third — because each was maintained by hand, by different people, at different times. Every mismatch is a site query waiting to happen.

Model-based schedules end the drift. Each schedule is a live query on the coordinated model: change the design and every schedule updates with it, automatically and consistently.

Schedule types

01
Architectural schedules

Doors, windows, rooms, finishes, sanitary fittings — formatted to your templates.

02
Structural schedules

Rebar and bar bending schedules, steel member lists, precast element registers.

03
MEP schedules

Equipment, fixtures, duct and pipe quantities, cable containment lengths.

04
Bills of quantities

Classified, tender-ready BOQs traceable element-by-element to the model.

05
Custom data extracts

Any parameter set your procurement, site or FM team needs, delivered as clean spreadsheets.

One source, zero contradictions

No more reconciliation.

Schedules, drawings and quantities agree by construction, not by checking.

Revisions in minutes.

A design change re-generates every affected schedule instantly.

Procurement-grade reliability.

Order from quantities that trace to geometry.

Stop reconciling documents.

Send us your model and the schedule formats you need — we'll return a live sample within days.