Build Faster with DfMA, Precast & PPVC BIM Services
From concept to fabrication-ready models — we deliver BCA-compliant DfMA, Precast and PPVC solutions that cut site time, reduce waste and keep your Singapore projects on schedule.
The modular shift demands a different kind of BIM
Off-site construction isn’t just a faster way to build — it’s a fundamentally different engineering challenge. Tolerances tighten from centimetres to millimetres. Coordination moves upstream. A clash caught on screen costs nothing; the same clash caught in a factory costs weeks.
We’ve built our practice around that reality. Every model we deliver is engineered for the factory floor, the transport route and the site crane — not just the design review.
From strategy to installation
Component rationalization, module standardization, connection simplification — feasibility studies, module breakdown strategies, constructability reports and Buildable Design Score support.
Tekla Structures detailing for the full precast portfolio: LOD 400 models, reinforcement detailing, BBS, production and erection drawings, lifting and rigging plans.
Full-module BIM (architectural, structural, MEP), inter-module connection details, tolerance analysis, installation sequencing, transport and crane studies.
Architectural, Structural and MEP models federated in Navisworks, scheduled clash cycles, resolution tracked to closure with auditable reports.
As-built updates, RFI resolution and on-site coordination — closing the loop between design, fabrication and construction.
Engineered for Singapore. Trusted regionally.
Every deliverable meets BCA Productivity, Buildable Design and CORENET BIM e-submission standards — structured for compliance, not retrofitted at submission.
Our shop drawings and models go straight to the factory floor. No translation layer, no version chaos.
From early DfMA strategy through final installation drawings, one team owns your modular workflow — not five.
HDB BTOs, private residential, hotels, dormitories, hospitals and commercial developments — delivered across Singapore, Malaysia, the Middle East and the UK.
How We Work
We review your project, drawings and goals to define the right modular strategy and BIM scope.
Federated models, clash detection and coordination with your design and fabrication partners.
Production-grade shop drawings, schedules and assembly sequences ready for the factory.
Engaged through installation — resolving RFIs and updating as-built models as construction progresses.
Let's build it right, off-site.
Send us your drawings, scope or RFP. We'll respond within one working day with a scoped proposal, timeline and team profile.