Plan the site that changes every week.

Construction space is temporary and contested. We model how access, lifting, storage and protection zones change as permanent works advance.

A site layout is never valid for the whole programme.

Construction site planning in 4D links logistics elements to the periods when they are installed, moved, shared or removed. Cranes, hoardings, gates, laydown areas, welfare facilities, access routes and temporary works are reviewed alongside the developing project.

A static plan can hide critical transitions. A delivery path may disappear when a façade closes, crane coverage may no longer reach the active zone, or stored materials may occupy the only route available to another trade.

CNE develops phased logistics models around the programme and proposed construction method. We make spatial assumptions visible so planners, contractors and safety teams can resolve constraints before they disrupt site operations.

Site resources placed in time

01
Site establishment

Hoardings, gates, welfare facilities, offices and controlled zones are modelled for relevant setup and relocation stages.

02
Crane and lifting studies

Crane positions, working radii, lifting zones, exclusions and major equipment paths are checked against the developing works.

03
Access and delivery routes

Vehicle, pedestrian and emergency paths are reviewed by phase, including turning, loading and temporary closures.

04
Laydown and storage

Material areas are allocated against installation dates, delivery batches and competing demands for limited site space.

05
Temporary works integration

Scaffolds, props, platforms, excavation support and protection systems are linked to installation and removal periods.

06
Phased logistics outputs

Plans, sequence views and animations are issued with assumptions and constraints for briefings and method reviews.

Synchro 4DNavisworks ManageAutodesk RevitCivil 3DPrimavera P6

Logistics tested against the active work front

Transitions receive attention

We review the handover between phases, when routes and resources are most likely to become temporarily unavailable.

Space is treated as a resource

Access, lifting and storage zones are scheduled with the same discipline as labour and equipment.

Assumptions are reviewable

The team can see crane reach, movement paths and temporary occupations instead of relying on notes alone.

Make every site phase workable.

Share the programme, site constraints and proposed logistics plan. CNE will model how access, lifting and temporary facilities must change over time.