See the schedule before you live it.

We link your BIM model to the construction program, so sequencing, site logistics and progress become something your whole team can watch, test and agree on — before work starts.

Time as the fourth dimension

A Gantt chart tells you when. A 4D model shows you how: every element of the building tied to its schedule activity, played forward as an animated build sequence. Conflicts between trades, crane positions, laydown areas and access routes become visible weeks before they’d surface on site.

The result is a program the whole team believes — because they’ve watched it build.

4D services

01
Time-based construction sequencing

Model elements linked to program activities in Synchro or Navisworks — an animated, testable build sequence.

02
Construction site planning

Cranes, hoardings, laydown, access and temporary works modeled and sequenced alongside the permanent structure.

03
Schedule development & validation

Sequence logic pressure-tested against the model — gaps, overlaps and impossible handoffs surfaced early.

04
Progress tracking

As-built progress mapped against the 4D baseline, so slippage is visible per element, not buried in a report.

05
Clash resolution across time

Workflow clashes — trades occupying the same zone in the same week — detected and resequenced before they cost hours on site.

Why 4D pays for itself

Fewer sequencing surprises.

Trade stacking, access conflicts and logistics pinch-points are found in the simulation, not the morning toolbox talk.

Stakeholders aligned fast.

A 60-second sequence animation communicates what a 400-line program can't.

Claims and disputes de-fanged.

A visual, dated record of planned versus actual progress.

Put your program on screen.

Send us your model and schedule — we'll link them and show you what the sequence really looks like.