See exactly where the programme is slipping.
We connect verified site status to the linked model and programme. Planned, completed and delayed work becomes visible by location, package and reporting date.
A percentage cannot show where the unfinished work sits.
BIM progress tracking records actual status against model elements and scheduled activities. Site observations, contractor updates and approved capture data are translated into a dated view of completed, active, delayed and not-started work.
Aggregate progress can conceal location-based problems. Two packages may report the same completion percentage while one has left scattered unfinished areas that block follow-on trades and the other has completed a clean handover zone.
CNE establishes status rules and evidence requirements before reporting begins. Each update preserves the source date and programme baseline so progress views remain comparable rather than becoming a sequence of disconnected colour-coded models.
Progress recorded in spatial context
Model sets, activities, reporting dates, status definitions and evidence requirements are agreed for each monitored package.
Approved observations, photographs, scans or contractor updates are mapped to the relevant locations and activities.
Elements are assigned verified progress states without overwriting the underlying design or coordination information.
Current status is compared with the selected programme baseline to show delayed, on-plan and advanced work.
Quantity or rule-based progress can be visualised by zone and package where the measurement basis supports it.
Dashboards, model views and concise issue notes identify blocked areas, dependencies and actions for the next period.
Status with location and evidence
Each status has a defined meaning, preventing different packages from reporting partial work on incompatible bases.
Reports identify the programme version and cut-off date used for every planned-versus-actual comparison.
The team can see whether remaining scope blocks a handover, access path or successor activity.
Turn site status into an actionable model.
Share your programme, reporting cycle and available site evidence. CNE will establish a clear method for tracking planned and actual progress.