Route every service before installation starts.

We model mechanical, electrical and plumbing systems as working networks. Routes, levels, access and equipment connections are coordinated within the real building space.

The ceiling void is shared territory.

MEP BIM modelling develops HVAC, electrical and plumbing systems into coordinated networks with defined equipment, routes, sizes, levels and connections. Each service must work technically while fitting around structure, architecture and every competing installation.

Treating MEP as disconnected linework causes problems at the busiest interfaces. Ducts collide with beams, cable containment blocks access panels, pipe gradients run out of depth and maintainable equipment becomes impossible to reach.

CNE models the systems together, with discipline ownership kept clear. The result supports multidisciplinary coordination, installation planning, documentation and downstream handover rather than a visually tidy but unbuildable ceiling.

What the coordinated MEP model contains

01
Mechanical systems

Ductwork, pipework, plant, terminals, insulation and access zones are modelled for coordinated routing and maintenance.

02
Electrical systems

Cable trays, trunking, conduits, equipment and distribution routes are developed around structural and architectural constraints.

03
Plumbing systems

Water, sanitary and drainage networks are modelled with sizes, gradients, invert levels, connections and required access.

04
Plantroom and riser layouts

Dense service zones are arranged with installation sequence, valve access, replacement paths and support space considered.

05
Builderwork requirements

Openings, sleeves, plinths, cast-ins and support interfaces are identified for coordination with architecture and structure.

06
Coordinated MEP outputs

Models, plans, sections, schedules and issue views are issued at the agreed LOD and information stage.

Autodesk RevitNavisworks ManageAutoCADMagiCADIFCBCF

Systems coordinated as systems

Routing respects performance

We consider gradients, insulation, bend space and access instead of forcing services through the shortest geometric path.

Congested zones receive focused attention

Risers, corridors, plantrooms and ceiling voids are developed where installation risk is highest.

Disciplines remain connected

Mechanical, electrical and plumbing decisions are tested against one another and the wider building model.

Find the right route for every service.

Explore our mechanical, electrical and plumbing modelling capabilities, or send us the full MEP scope for one coordinated delivery plan.